Plans for transport and parking changes for the Olympic Games have been finalised by Greenwich Council, TfL and LOCOG, as you may have seen by the many notices decorating lamp-posts in Shooters Hill, competing with the Jubilee bunting. As expected there will be parking restrictions in Shooters Hill during the games – we will be in an Event Day Zone, or EDZ in the Council’s acronym- laden notices – and we will need to apply for residents parking permits.

The parking restrictions will now be in place from 27th July to 9th September, covering both the Olympic and Paralympic games and the period in between, and will operate every day between 8.30am to 7.00pm. Parking will be allowed for up to 2 hours without a permit, but for over 2 hours a residents or visitors permit will be have to be displayed. Permits will only cover us for the Shooters Hill sub-zone, labelled OC in the Council’s maps, not for any other restricted parking area.

The boundaries of the EDZ look almost unchanged from the original proposal, apart from a slight change round the junction of Upton Road and Ennis Road on the eastern boundary, and a change south of Shooters Hill Road to add in the Royal Herbert Pavilions and the Broad Walk/Mayday Gardens area.

We can check whether we live in a postcode where we need a permit, and apply for the permit,  through the Greenwich 2012 Parking Permits web-site – it has separate links for residential and business checks. We have  until 14th July to register. There is also a phone number for people who are not on the internet – 0300 777 2012.  I found the system a little bit unclear: it told me that my vehicle was already on its database and that I didn’t need to apply for a permit. So I assume I will just be sent a permit within 5 days, as stated on the frequently asked questions list?    When I applied for my 2 visitor permits the site says “to activate the permit when your visitor arrives, please click on the Book a visitor button, found at the top left corner of this screen” – there is no such button on the screen. Teething problems I guess.

Ha-Ha Road closed
Ha-Ha Road closed for Olympics test event

There will be two sets of changes to roads – the closures within the events area at the Royal Artillery Barracks and the Olympic Route Network. The road closures will be the same as for the test events in May, as the Royal Borough of Greenwich web site says:

In Woolwich:

  • there will be no right turn for traffic from Woolwich New Road on to Grand Depot Road during Games time
  • there will be 38 pre-bookable parking spaces for Blue Badge users on Woolwich Common
  • Repository Road and Ha Ha Road will be closed to traffic between 7 July and 19 September. However, there will still be full access for emergency vehicles

Congestion on Shooters Hill and Shooters Hill Road increased quite a lot during the test event when Ha-Ha Road was closed; I guess it may be even worse when the games are on as there will be increased traffic and the road restrictions from the Olympic Route Network.

Local snippet from TfL Olympic Route Network map
Local snippet from TfL Olympic Route Network map
Olympic Route Network sign
Olympic Route Network sign

The Olympic Route Network doesn’t come up as far as Shooters Hill, but does effect Charlton Park Lane and Shooters Hill Road between Greenwich and Charlton Park Lane. The main changes as far as I can tell are:

?    A “Games Lane” on Shooters Hill Road from Blackheath to the Sun in the Sands roundabout, and then to Eastbrook Road. Only official games vehicles are allowed in the Games lane between 6.00am and midnight.

?    Shooters Hill Road to become a “No stopping at any time” road up to Charlton Park Lane, with some roadside parking changed to partial footpath parking.

?    Temporary removal of road humps and width restrictions on Charlton Park Lane.

?    Changes to some parking on Charlton Park Lane and no stopping at any time along the Lane.

The work needed to create the ORN, such as road markings and traffic light changes, is planned to start at the beginning of  July, which I imagine may also have an effect on traffic congestion, and the ORN will be operational between 25th July and a few days after the games end on 12th August, and then the Paralympic Route Network (PRN) will be in place from the 27th August until the Paralympics end on 9th September.

Train and bus services will also be changed during the Olympics. Because of the road closures there will be similar changes to bus routes  161, 178, 291, 386, 469, 486 as there were at the test event last month, including the temporary 561 bus route from Chiselhurst to the Queen Elizabeth Hospital – full details of all the diversions and dates are in the detailed TfL document starting from page 37.

On the trains, the biggest change will be the closure of Woolwich Dockyard station from 28th July to 12th August, as shown on the snippet from the Get Ahead of the Games rail impact tool, below. In addition there will be a reduced service at Kidbrooke, Westcombe Park, Maze Hill and Deptford and it is expected that Greenwich, Charlton, Blackheath, London Bridge and Waterloo will be exceptionally busy during the games –  the Get Ahead of the Games web site has details of busy times and dates. Southeastern Trains’ timetables are also changing during the Games.

Sounds like a good time to change commuting times, or even work at home if possible.

Snippet from Get Ahead of the Games interactive rail impact tool
Snippet from Get Ahead of the Games interactive rail impact tool

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.